Horadiz–Agband railway construction to be completed by 2028
Infrastructure
- 16 April, 2026
- 15:50
Add Report.az to preferred Google sources
Stay up to date with the top news!
The Horadiz–Agband railway line, a key segment of the Zangazur corridor, is scheduled for completion in 2028, Azerbaijani Deputy Prime Minister Shahin Mustafayev stated at the 24th meeting of the Azerbaijan–Russia Intergovernmental Commission on Economic Cooperation, Report informs.
Mustafayev said that the railway line will have a total length of approximately 110 km, and about 140 km including side tracks. "Currently, around 75% of the project has been implemented, with the main construction works already completed," Mustafayev stated.
Latest News
20:35
International coalition calls Armenia's hosting of COP17 a double standard
Foreign policy
20:20
Video
Video dedicated to Patriotic War posted on President's social media accounts
Domestic policy
20:10
Ilham Aliyev congratulates National Paralympic Committee on 30th anniversary
Domestic policy
19:51
Celal Çiftçi publicly apologizes to Azerbaijan after being placed on wanted list
Foreign policy
19:37
Sweden to provide Ukraine with new $52.3 million aid package to support civilians during winter
Other countries
19:06
Azerbaijan readmits 52 people from European countries in September
Foreign policy
18:59
Photo
Azerbaijan, UAE discuss prospects for special forces cooperation
Military
18:41
CBA chairman links pace of economic diversification to 2027–2030 reforms
Finance
18:34
Taleh Kazimov: Rising oil and gas prices increase Azerbaijan's current account surplus
Finance