Construction of a new railway from Astara to Iran ends
Infrastructure
- 07 November, 2016
- 09:43
Add Report.az to preferred Google sources
Stay up to date with the top news!
Baku. 7 November. REPORT.AZ/ Construction of 8.3 km new one-way railway from Azerbaijan's Astara station to Iran's state border has been completed.
4 stands and walls constructed and concreted over the Astara river bridge.
Spokesperson of Azerbaijan Railways CJSC Nadir Azmammadov told Report that the final works are being done. At present, the arches and guardrails installation process is underway.
Construction of 82.5 meters long railway bridge over Astara river on Iranian state border have started on April 20, 2016.
13 water plants installed for wastewater discharge, 2 tunnels were built under the road bed for the purpose of inter-village road.
Latest News
17:39
Adjara's culture minister proposes creating joint youth orchestra with Azerbaijan - Exclusive
Foreign policy
17:27
Cross-sector information sharing key to preventing cyberattacks, official says
ICT
17:22
Azerbaijan joins Makkah Convention on anti-corruption co-op among OIC states
Foreign policy
17:16
European Commission approves €5.4B loan for Hungary under SAFE
Foreign policy
17:05
Central Bank official warns against delays in cyber incident reporting
ICT
17:03
Photo
Azerbaijan, UAE sign military cooperation roadmap for 2027–2029
Military
17:00
Photo
Report Media School welcomes its 22nd group of trainees
Media
16:57
Global crime cannot be fought by single state alone, Iranian ambassador says
Foreign policy
16:56
Azerbaijani banks' net foreign assets rise 22.6% year-on-year
Finance