Reconstruction works are underway at Darwin Bankasy field
Energy
- 22 May, 2017
- 13:05
Add Report.az to preferred Google sources
Stay up to date with the top news!
Baku. 22 May. REPORT.AZ/ Reconstruction works are underway at stationary offshore platform No 740 for drilling of 8 wells at Darwin Bankasy field.
Report informs referring to the State Oil Company of Azerbaijan Republic (SOCAR), works carried out on request of Oil and Gas Production Department of "Azneft" Production Union (PU). As a result of work, 4 well mines and guide tube were immersed. ementing work have been completed, monifold block was built and technological lines drawn.
The work carried out in accordance with security and safety with all modern requirements. Works on the project are underway.
Notably, additional wells are planned to produce 5 tons oil per day.
Latest News
10:07
Azeri Light crude nears $107 per barrel
Energy
09:49
Police officer, suspect killed in US shootout
Other countries
09:46
Azerbaijan holds 24th place in UEFA rankings
Football
09:43
WB: Azerbaijan reduces external debt amid rising levels across Europe, Central Asia
Finance
09:40
Photo
Azerbaijan, Ukraine adopt cooperation plan at Uzhhorod meeting
Energy
09:34
US Democrats target tariffs on Canadian goods in push to revise Trump trade policy
Other countries
09:31
Brent exceeds $100
Energy
09:26
Iran launches domestic satellite internet project to counter Starlink
Region
09:25
Azerbaijan marks Television and Radio Day, a century after its first radio broadcast
Media