“Azerbaijan” Thermal Power Station launched after major overhaul
Domestic policy
- 25 June, 2020
- 09:19
Add Report.az to preferred Google sources
Stay up to date with the top news!
The 330 and 500-kilovolt open switchgear, eight power blocks, Dispatcher Management Center, main and auxiliary areas, buildings, and facilities of the “Azerbaijan” Thermal Power Station have been launched after a major overhaul.
President of the Republic of Azerbaijan Ilham Aliyev attended the event.
The head of state was informed of the conditions created at the station.
Photo
Photo
Latest News
21:43
Photo
AmCham Azerbaijan, insurers discuss strategic partnership
Finance
21:41
Vatican News coverage featuring Armenian disinformation discussed
Foreign policy
21:24
Azerbaijan highlights UN Disarmament Commission's vital role
Foreign policy
21:14
Austrian firms could boost Azerbaijan's transport links, envoy says
Foreign policy
21:11
Austrian ambassador seeks stronger bilateral ties with Azerbaijan
Foreign policy
20:45
Azerbaijan, Austria see potential for infrastructure and logistics ties
Foreign policy
20:37
Azerbaijan, Austria to hold political consultations in Baku in November
Foreign policy
20:33
Baku to host Caspian and Black Sea oil and gas conference in April 2027
Energy
20:20
Moratinos thanks Aliyev for continued support for UNAOC
Foreign policy